Due to mechanical problems at PLT tonight’s paving has been canceled by APAC. Work will resume tomorrow night #VW

  • 1162 days ago via site
  • 26

Been in plenty of confrence rooms this week. This one has the best name.

On the #apwaexpo floor.

MOT in Denver.

Fun photo for Friday.

  • 1607 days ago via site
  • 23

No turn on red signs at Hotel Plaza & BVD have been replaced.

Two potholes need to be repaired on BVD WB just after World Dr SB intersection.

Rutting on BVD EB just before World Dr SB intersection. Cut & patch repair.

Striping at World/BVD off-ramp was completed last night. #Roads

BVD @ Buena Vista Palace entrance low area pavement needs to be repaired again.

Wow! That is a lot of paper.

No erosion found. Discarge pipe construction is ongoing.

Comm trench on canal side of levee has no silt fence. Informed contractor to fix

Crew installing discharge pipe on site towards pond.

#Pothole 78 is located in the RCID Admin parking lot. Cut and patch.

Area of additional depth being cleaned. #Spill

#Repair 77 on BVD EB before World Dr is a large area in need of cut & patch.

BVD EB by Blizzard has large #Repair 76 and needs to be cut & patched.

Defect on Western Way WB is shallow & must be cut to depth & patched #Repair 75

Defect on Western Way WB is shallow & must be cut to depth & patched #Repair 75