Get the official Twitpic for iPhone app

MBTA

@mbtaGM

The Official Twitter feed of the Massachusetts Bay Transportation Authority (MBTA).

Photos and Videos by @mbtaGM

  • Timeline
  • Gallery

New for this morning's commute: A new, redesigned mobile MBTA.com! #mbta

  • 187 days ago via site
  • 495

A look behind the scenes at MBTA crews completing work near Alewife today. #mbta

  • 189 days ago via site
  • 365

A look at some of the Red Line work being completed on weekends as part of the floating slab project. #MBTA

  • 192 days ago via site
  • 525

Cutting the ribbon on the new Science Park/West End Station #mbta

Acting GM Jon Davis at the opening of the new, accessible Science Park/West End Station #mbta

Red Line - Weekends: Buses will replace trains from Harvard to Alewife, this weekend through March 4. #mbta

  • 205 days ago via site
  • 1,020

Acting GM Jon Davis at the MBTA's Everett facility this morning. #mbta

  • 221 days ago via site
  • 160

Lt. Gov Murray and Acting GM Davis enjoying the train ride from Worcester to Boston this morning. #mbta

Thanks you everyone who joined Acting GM Davis at our "Talk to the T" last night at Park Street! #mbta

  • 260 days ago via site
  • 155

Acting GM Jon Davis celebrating the launch of the "Mass Agriculture Rides the T" campaign today #mbta

Multiple trees down along the Franklin Line near Windsor Gardens. Crews are on scene now. #mbta

  • 272 days ago via site
  • 330

Trees down along the Franklin line. Crews out assessing the situation and removing trees. #mbta

A large tree down east of Waban Station. Crews on scene evaluating the situation. #mbta

Another of the tree fallen above the Green Line. #mbta

Trees fallen on wires above the Green Line. Crews on scene now. #mbta

Trees fallen along the Red Line tracks near JFK. MBTA crews on scene now.

Here is a tree down at the Lynn Busway. MBTA crews out inspecting facilities, clearing debris, making any needed repairs. Safety top priority.

  • 272 days ago via site
  • 420

MBTA crews out inspecting the Green Line.

  • 272 days ago via site
  • 545

MBTA maintenance and operations teams preparing to begin inspecting the D branch of the Green Line. #mbta

  • 272 days ago via site
  • 560

MBTA crews clearing a tree of the tracks south of Fields Corners. #mbta

  • 272 days ago via site
  • 575

1 2 3 4 5 Next